20 tons per hour steel Tmt rebar deformed rebar rebar for construction rolling mill production line

Hi, welcomeCompany Profile: The company is specialized in the production and sales of integrated manufacturers, mainly engaged in steelmaking/continuous casting/rolling mill /heating equipment, including intermediate frequency furnace/continuous casting machine/rolling mill/stepping cold bed/straightening machine and other

Featured Products

Hi, welcome
Company Profile:
 The company is specialized in the production and sales of integrated manufacturers, mainly engaged in steelmaking/continuous casting/rolling mill /heating equipment, including intermediate frequency furnace/continuous casting machine/rolling mill/stepping cold bed/straightening machine and other complete set of production line equipment.

20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line 

Product Description

20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line
Model No.Roller barrel 
Φmax/Φmin*Length
700Φ700/600X800
610Φ610/530X760
530Φ530/460X760
470Φ475/400X650
370Φ370/330X650
350Φ350/320X650

Welcome you to inform us your requirement, like input billet size and output product size, product thickness, capacity, etc.,  we will provide solutions upon receiving your messages.
Certificate
20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line
20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line
20 Tons Per Hour Steel Tmt Bar Rebar Deformed Bar Iron Rods for Construction Rolling Mill Production Line


After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade
    Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
    Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.

    FAQ

    Are you manufacture?
    Yes.
    What information do you want to know if i want to get a quotation?
    a). The model/size of your products.
    b). The application for your products.
    c). Special package methods if you needs.
    d). Raw material.
    Do you inspect the finished products?
    Yes.Each step of products will be carried out inspection by QC department until shipping
    What advantages do you have?
    (1) Punctual: Have your orders met with the latest delivery?
    We are a manufacturer with so many advanced and new machines. It ensures we have the ability to carry out the production schedual for punctual delivery.
    (2) 20 year production experience. We have over 20 years exprerience in this industry. That means we can preview the problems for the orders and production. Therefore, it will make sure to deduce the risk of bad situation to happen.


     


     

    Contact us

    Please feel free to give your inquiry in the form below We will reply you in 24 hours