Porducts details
Products Images
Package Details
Carton bulk packing.1000PCS/Small inner boxes packing),or according to customers' requirements.
Size reference
Application
Factory show
FAQQ: How long is your delivery time for TOP Zinc Wafer Modified
Truss head self-drilling screw | |||
Material | C1022A STEEL | ||
Surface | Zinc Plated,Oxide black,Nickel Plated,Bronze Plated | ||
Drive type | Phillips,Pozi,Slot,Torx,Square,Combination | ||
Head type | wafer truss head | ||
Thread type | AB Type,A Type | ||
Diameter | M3.9,M4.2,M4.8;#7,#8,#10 | ||
Length | 13-150mm,1/2"-6" | ||
Packing | 15-25kgs bulk in carton,then on export pallet 500pcs/800pcs/1000pcs in small box,then in carton,then on export pallet Customize the qtys in customized small box,then in carton,then on export pallet |
Package Details
Carton bulk packing.1000PCS/Small inner boxes packing),or according to customers' requirements.
Size reference
SIZE | THREAD SIZE(mm) | TOTAL LENGTH(mm) | HEAD DIAMETER(mm) | HEAD THICKNESS(mm) |
M4.2*13mm | 4.20 | 15.20 | 10.26 | 2.19 |
M4.2*16mm | 4.16 | 18.17 | 10.61 | 2.20 |
M4.2*19mm | 4.15 | 20.96 | 10.74 | 2.06 |
M4.2*25mm | 4.20 | 27.09 | 10.54 | 2.21 |
M4.2*32mm | 4.17 | 34.29 | 11.08 | 2.68 |
M4.2*38mm | 4.15 | 39.93 | 10.59 | 2.46 |
M4.2*50mm | 4.19 | 52.01 | 10.63 | 2.03 |
The above data is measured manually by a single batch, the error is within ±0.5mm, please refer to the product. |
Application
Factory show
FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer and also do trading.
Q: How long is your delivery time for TOP Zinc Wafer Modified
Truss Head TEK Self Drilling Sheet Metal Screws?
A: Generally it is 5-10 days if the goods are in stock.
or it is 15-20 days if the goods are not in stock, it is according to quantity.
or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=3000USD, 100% in advance. Payment>=3000USD,
30% T/T in advance ,balance before shippment.
30% T/T in advance ,balance before shippment.